Port Stanvac Desalination Plant
Korvest Engineers used FRP cable ladder products to design a customised structure for the support of electrical infrastructure at the Adelaide Desalination plant.
The structural design of the ladder network maximised the capabilities of the corrosion resistance of the product, while working around the tight and difficult areas of the plant, and conforming to the site specific quality and safety standards required.
The operators of the site received a solution that was easy and economical to install, and an assurance that their network of high capacity cables are supported by a system that will last for many years into the lifetime of the plant.